1. Home
  2. Portfolio
  3. Behind the Finish

Behind the Finish

The unseen half of luxury: arches framed, niches formed and lighting channels set long before the first coat of microcement.

Project
Process · First Fix
Finish
Plasterboard arches, niches, cove channels
Lighting
Recessed LED channels installed before finishing
Location
South East England

The brief,the finish.

Beautiful finishes depend on invisible preparation. Here, arches are framed and boarded, glass-block niches fitted and cove channels routed in, ready for the finishing coats that will make them disappear into one surface.

It is the discipline behind everything you see in the rest of this portfolio.

Arched doorway with continuous LED cove lighting installed before the final finish
Commercial unit during first fix with plasterboard arches taking shape
Glass-block display niche during installation with a temporary work light

Imagine this inyour space.

Tell us about the room, the building or the brand. We will visit, listen and respond with a considered proposal.

WhatsApp